Traditional Sewer Dig & Replace Calculator
Enter footage + depth, then calculate.
Automatic Additions
Auto-adds $1,500 if depth > 10 ft
Efficiency / Overhead / Profit
CIPP PRO – Full Production Estimator
Job Difficulty Point → Multiplier Calculator (Pro)
Labor rates: 1 man = $230/hr • 2 men = $285/hr. After-hours is a flat add-on fee.
Final engine: Final = Marked-up Materials + (Labor × Difficulty) + Fees + Contingency
Step 1 — Score the Job (0–3 each)
Step 2 — Enter Costs + Options
Quarter-hour steps supported (0.25).
Flat add-on, only if toggled on.
$0.00
Standard+
Points: 0/18 • Difficulty: 1.00× (—)
| Crew Rate | $0.00/hr |
| Hours | 0.00 |
| Base Labor (Rate × Hours) | $0.00 |
| Labor × Difficulty | $0.00 |
| Materials (marked up) | $0.00 |
| Trip/Dispatch | $0.00 |
| Sub/Equipment | $0.00 |
| Permit | $0.00 |
| After-hours flat fee | $0.00 |
| Subtotal (pre-contingency) | $0.00 |
| Contingency | $0.00 |
| Discount / Adjustment | $0.00 |
| Total (before tax) | $0.00 |
| Tax | $0.00 |
| Final Total | $0.00 |