Traditional Sewer Dig & Replace Calculator

Traditional Sewer Dig & Replace Calculator

Enter footage + depth, then calculate.

Automatic Additions

Auto-adds $1,500 if depth > 10 ft

Efficiency / Overhead / Profit

CIPP PRO – Production Estimator

CIPP PRO – Full Production Estimator

Job Difficulty Point Multiplier Calculator (Pro)

Job Difficulty Point → Multiplier Calculator (Pro)

Labor rates: 1 man = $230/hr2 men = $285/hr. After-hours is a flat add-on fee. Final engine: Final = Marked-up Materials + (Labor × Difficulty) + Fees + Contingency

Step 1 — Score the Job (0–3 each)

Step 2 — Enter Costs + Options

Quarter-hour steps supported (0.25).
Flat add-on, only if toggled on.
$0.00
Standard+
Points: 0/18 • Difficulty: 1.00× ()
Crew Rate$0.00/hr
Hours0.00
Base Labor (Rate × Hours)$0.00
Labor × Difficulty$0.00
Materials (marked up)$0.00
Trip/Dispatch$0.00
Sub/Equipment$0.00
Permit$0.00
After-hours flat fee$0.00
Subtotal (pre-contingency)$0.00
Contingency$0.00
Discount / Adjustment$0.00
Total (before tax)$0.00
Tax$0.00
Final Total$0.00